Best data centers for mining in Russia

Building reliable mining infrastructure since 2017

from 3.30 rubles
low tariff
including VAT
Registry miners
adding clients to the registry
Russian miners
Without commissions
No hidden fees for
equipment placement
99 %
High
uptime

About our data centers

Premium-class mining hotels. Everything is legal and certified. Reliable operation guaranteed. SLA: 99.9%.

4 pcs.
operating data centers
49 MW
total power

Our specialized mining facilities are located on our own premises with a direct connection to a power plant, which guarantees a stable power supply. Security is provided by round-the-clock video surveillance, perimeter alarms, security guards, and Russian National Guard panic buttons.

Professional service

The containers are equipped with video cameras, thermal sensors, climate control systems, UPS, and surge protection, ensuring optimal conditions for the equipment. Maintenance is performed 24/7, and personnel undergo specialized training and electrical safety certification (Level 4).

Everything is under control

Specialized software allows remote monitoring and control of equipment. Service centers operate on-site for prompt repairs. Equipment connection takes no more than 24 hours from the moment of arrival.

Why choose Mining Cluster data centers

Mining Cluster Company is the #1 provider of mining equipment hosting services

99% Uptime

Downtime of no more than 3 hours per month

Legally

Fully legal placement

24/7 support

24/7 technical support

4 data centers

With a total capacity of 49 MW

from 3.30 rubles

The lowest electricity tariff starts from 3.3 rubles including VAT

PJSC ROSSETI“

Official contract with the largest electricity supplier in the Russian Federation

Certification

The sites are being inspected by a commission of Rosseti, PJSC“

Safe

Paramilitary security operates at the facilities

Premium data centers Mining Cluster

  • 176 MW

    Arctic zone of the Russian Federation

    Number of sites: 8

    Vacant 20 MW
    Busy 70 MW
    Under construction 86 MW
    Place
  • 30 MW

    Tver Oblast

    Number of sites: 1

    Vacant 8 MW
    Busy 12 MW
    Under construction 10 MW
    Place
  • 120 MW

    Tyumen Oblast

    Number of sites: 2

    Under construction 20 MW
    Under design 100 MW
    Place
  • 220 MW

    Komi Republic

    Gas-fired power plant

    Under construction 112 MW
    Under design 108 MW
    Place

Mining Cluster site infrastructure

Using the example of the data center in Murmansk

Install equipment in 5 steps

Contract

We are processing the placement agreement

Step 1

Delivery

We are organizing the delivery

Step 2

Preparation

We are performing maintenance before connection

Step 3

Settings

Setting up and turning on the equipment

Step 4

Launch

We are submitting documents for inclusion in the Miners Register

Step 5

Mining Cluster

An industrial mining operator providing a powerful and reliable infrastructure for the efficient scaling of your mining business.

4 pcs.
operating data centers
49 MW
general
power
120 000+ unit.
Sold
equipment
2+ billion.
revenue
for 2024
15 000+ unit.
ASICs
in management
89 emloyees
state
companies
About Us
Leaders of the RBC ranking

The highest growth rates in the mining industry

Accreditation by the Ministry of Digital Development of the Russian Federation

Included in the state register of accredited mining companies.

Mining operator

We hold the official status of a mining infrastructure operator in Russia.

Resident of the Arctic Zone of the Russian Federation

We take part in the preparation of initiatives and regulatory proposals for the development of the industry.

APM Participant

We are joining the Industrial Mining Association and supporting the development of the industry in the country.

Member of the MCCI

We are members of the Moscow Chamber of Commerce and Industry and participate in industry projects.