Construction of gas-powered data centers for mining in partnership with PSM

Together with a leading manufacturer of power equipment, we are implementing modular data centers at gas fields.

From 1 ₽ / kWh
low cost
energy
from 2 years
fast
payback period
Before 200 MW
possibility
scaling

About the Partner

PSM is the largest manufacturer of gas and diesel
energy centers in Russia

2 000 MWT
shipped
capacities
3
factory
in the Yaroslavl region
10 billion ₽
annual revenue
companies
650
employees
on the team
50
design engineers
in the state
20 years
experience
in mechanical engineering

Gazprom LNG Plant«

3.5 MW
Two gas-fired power plants in the Amur and Volgograd regions. Operating in parallel with the grid.

NOVATEK LNG Plants«

8 MW
Two gas-fired power plants in the «Kashira» and «Tolyatti» Special Economic Zones. Main power supply, with gas-fired units operating in parallel.

ALROSA Diamond Deposit«

12 MW
Gas-fired power plants with heat recovery systems. Primary power supply at temperatures as low as -60 °C.

"Sadovyi" Housing and Construction Cooperative«

3 MW
Power Supply for the LNG Plant in the Urals. Parallel Operation with the Grid to Meet the Total Load.

For whom

Mining Operators (B2B)

Increased site ROI, stable access to electricity, time to launch, SLA

Large Miners (B2B)

Low cost per kWh, reliable access to electricity

Gas owners/partners

Gas Monetization, Environmental Sustainability, Recycling, Joint Ventures

Manufacturing Companies

Mining as a New Source of Income

Gas vs. the Grid

Gas-Fired Power Generation Grid electricity
Cost of 1 kWh from 2.50 ₽ from 3.60 RUB
Capital expenditures more less
Launch deadline from 3 months from 1 month
Scaling in blocks of 0.5 MW It depends on the specifications
Ecology APG/biogas utilization no disposal
Payback period from 22 months from 22 months
Scroll sideways

Workflow

Selection

Selection of the deposit and geological evaluation

1-2 months

Documents

Cooperation with well owners and legal support

1-2 months

Engineering design

Design and component selection

2-4 months

Equipment

Manufacture and supply of equipment

1-4 months

Launch

Commissioning and operation

up to 1 month

Project economics

Using a 10 MW project as an example
OPEX (monthly)
20,2 million rubles
Electricity (1 kWh = 2.04 R with VAT): 14.4 million RUB
Mining Tax (25%): 5.8 million rubles
CAPEX
1,64 billion ₽
Monthly income
79,6 million rubles
Net profit per month
59,4 million rubles
Payback period
~27 months
Remaining equipment value
~50 %

Gas-powered mining data centers

from 72 500 000 000 

Gas-powered mining data center 500 MW

5.0
Hashrate 32.76 EH/s
Number of ASICs 140 000
In stock
from 15 580 000 000 

100 MW gas-powered mining data center

5.0
Hashrate 6.55 EH/s
Number of ASICs 28 000
In stock
from 44 280 000 000 

300 MW gas-powered mining data center

5.0
Hashrate 19.66 EH/s
Number of ASICs 84 000
In stock
from 4 821 000 000 

30 MW gas-powered mining data center

5.0
Hashrate 1.96 Eh/s
Number of ASICs 8 400
In stock
from 8 200 000 000 

50 MW gas-powered mining data center

5.0
Hashrate 3.27 EH/s
Number of ASICs 14 000
In stock
from 820 000 000 

5 MW gas-powered mining data center

5.0
Hashrate 327.6 Ph/s
Number of ASICs 1 400
In stock
from 1 640 000 000 

10 MW gas-powered crypto mining data center

5.0
Hashrate 655.2 Ph/s
Number of ASICs 2 800
In stock
from 164 000 000 

1 MW Gas-Powered Mining Data Center

5.0
Hashrate 65.52 PH/s
Number of ASICs 280
In stock

Automation

Remote monitoring and management

SCADA + IoT

24/7 real-time monitoring of parameters

PSM Check PRO

Self-learning GPU failure analytics and forecasting platform

Automatic Notifications

Prompt response and no downtime

Web interface

Access from any device

Benefits for Investors

Gas mining: your reliable investment project

Liquid equipment as an asset

The containers are equipped with video cameras, temperature sensors, climate control systems, UPS units, and surge protection.

High yield

Specialized software allows you to remotely monitor and control equipment.

Long-Term Partnership and Investment Protection

Specialized software allows you to remotely monitor and control equipment.

Mining Cluster

An industrial mining operator providing a powerful and reliable infrastructure for the efficient scaling of your mining business.

4 pcs.
operating data centers
49 MW
general
power
120 000+ unit.
Sold
equipment
2+ billion.
revenue
for 2024
15 000+ unit.
ASICs
in management
89 emloyees
state
companies
About Us
Leaders of the RBC ranking

The highest growth rates in the mining industry

Accreditation by the Ministry of Digital Development of the Russian Federation

Included in the state register of accredited mining companies.

Mining operator

We hold the official status of a mining infrastructure operator in Russia.

Resident of the Arctic Zone of the Russian Federation

We take part in the preparation of initiatives and regulatory proposals for the development of the industry.

APM Participant

We are joining the Industrial Mining Association and supporting the development of the industry in the country.

Member of the MCCI

We are members of the Moscow Chamber of Commerce and Industry and participate in industry projects.