Key parameters
We offer unique data center design services
Wide power range
We design data centers from 1 MW to 200 MW for tasks of any scale.
Flexible placement formats
Engineering solutions based on containers or in hangar buildings.
Connection and energy centers
We design grid connections or build our own gas-fired power plants.
Customer site analysis
We are evaluating the possibilities of locating a data center and power generation on your territory.
Commissioning
Ensuring operational readiness in compliance with all Rostechnadzor requirements and tolerances.
Organization of operation
We offer comprehensive data center technical maintenance services.
The Mining Cluster Group of Companies is a leading integrator of mining infrastructure in Russia. We design data centers taking into account all factors: climatic conditions, availability of energy resources, logistics, and equipment specifics.
Arctic experience
More than 5 successfully implemented projects in the Arctic zone of the Russian Federation
Powerful solutions
Engineering solutions for power complexes up to 200 MW
What is included in turn-key design
Full cycle of engineering services — from site analysis to working drawings and specifications for manufacturers.
Site analysis
Assessment of infrastructure, climatic conditions, and logistics.
Conducting engineering surveys
Geological, geodesic, environmental and other necessary types of surveys.
Development of the Terms of Reference
Preparation and approval of the technical specifications for your tasks.
Design and estimate documentation
Complete set of documents for expert review and construction.
Energy modeling
Calculation of requirements, selection and integration of power complexes.
Drawings and factory orders
Detailed diagrams and tasks for manufacturing modules and containers.
We develop solutions tailored to the integration of power complexes, including gas piston, gas turbine, diesel, and hybrid power plants. We design power complexes with a capacity of up to 200 MW, including gas treatment and connection to main grids.
Schedule for design and survey works
We provide a transparent and clear roadmap for project work — from 10 to 400 calendar days, depending on the scale and requirements of the project.
| 4 weeks | 12 weeks | 12 weeks | 20 weeks | 16 weeks | |
|---|---|---|---|---|---|
| Collection of initial data + PPI | |||||
| Main technical solutions | |||||
| Engineering surveys | |||||
| Project documentation | |||||
| Working documentation |
Our cases
Our partners and experts
As part of the preparation of basic technical solutions for considering all factors relevant to justifying the choice of the most rational equipment configuration for the energy complex, experts from specialized organizations with relevant practical experience in operating the equipment required for the construction of on-site generation energy complexes are involved when necessary.
Arctic Power Capital LLC«
Holding company managing energy assets that supply electricity and thermal energy to end consumers.
GenMaster LLC«
A company specializing in the maintenance and servicing of gas and diesel power plants from all well-known manufacturers since 2010.
LLC Impex-1«
The company is a multivendor supplier and integrator of generating equipment (diesel, gas piston, and gas turbine power plants) for various purposes and capacities.
Mining Cluster
An industrial mining operator providing a powerful and reliable infrastructure for the efficient scaling of your mining business.
power
equipment
for 2024
in management
companies