Equipment colocation in Mining Cluster data centers

Building reliable mining infrastructure since 2017

from 3.30 rubles
low tariff
including VAT
Registry miners
adding clients to the registry
Russian miners
Without commissions
No hidden fees for
equipment placement
99 %
High
uptime

Why choose Mining Cluster data centers

Mining Cluster Company is the #1 provider of mining equipment hosting services

99% Uptime

Downtime of no more than 3 hours per month

Legally

Fully legal placement

24/7 support

24/7 technical support

4 data centers

With a total capacity of 49 MW

from 3.30 rubles

The lowest electricity tariff starts from 3.3 rubles including VAT

PJSC ROSSETI“

Official contract with the largest electricity supplier in the Russian Federation

Certification

The sites are being inspected by a commission of Rosseti, PJSC“

Safe

Paramilitary security operates at the facilities

Premium data centers Mining Cluster

  • 176 mW

    Arctic zone of the Russian Federation

    Number of sites: 8

    Vacant 20 mW
    Busy 70 mW
    Under construction 86 mW
    Place
  • 30 mW

    Tver Oblast

    Number of sites: 1

    Vacant 8 mW
    Busy 12 mW
    Under construction 10 mW
    Place
  • 120 mW

    Tyumen Oblast

    Number of sites: 2

    Under construction 20 mW
    Under design 100 mW
    Place
  • 220 mW

    Komi Republic

    Gas-fired power plant

    Under construction 112 mW
    Under design 108 mW
    Place

Who are our customers

Miners

These are medium-sized (from 10 to 500 units) and large-sized (from 500 units) miners

Companies

These are companies and entrepreneurs who understand that, given the legalization of mining, this business has become not only one of the most profitable, but also legal.

Investors

These are people who value their time and create passive income in cryptocurrency

High UPTIME 99%

Our experience and professionalism allow us to ensure virtually uninterrupted operation. Every month, we have no more than 3 hours of technical downtime associated with the preventive maintenance of containers and transformer substations, as well as scheduled maintenance of power supply plants, which in the long term allows us to provide miners with maximum profitability.

Let's consider downtime losses using the example of 50 devices in operation
Antminer S21 PRO 234 TH, 3700 W

When the BTC price is 90,000 $

Your benefit
189 000 ₽ / month

Install equipment in 5 steps

Contract

We are processing the placement agreement

Step 1

Delivery

We are organizing the delivery

Step 2

Preparation

We are performing maintenance before connection

Step 3

Settings

Setting up and turning on the equipment

Step 4

Launch

We are submitting documents for inclusion in the Miners Register

Step 5

Mining Cluster

An industrial mining operator providing a powerful and reliable infrastructure for the efficient scaling of your mining business.

4 pcs.
operating data centers
49 MW
general
power
120 000+ unit.
Sold
equipment
2+ billion.
revenue
for 2024
15 000+ unit.
ASICs
in management
89 emloyees
state
companies
About Us
Leaders of the RBC ranking

The highest growth rates in the mining industry

Accreditation by the Ministry of Digital Development of the Russian Federation

Included in the state register of accredited mining companies.

Mining operator

We hold the official status of a mining infrastructure operator in Russia.

Resident of the Arctic Zone of the Russian Federation

We take part in the preparation of initiatives and regulatory proposals for the development of the industry.

APM Participant

We are joining the Industrial Mining Association and supporting the development of the industry in the country.

Member of the MCCI

We are members of the Moscow Chamber of Commerce and Industry and participate in industry projects.