Project implementation options
Project economics per 1 MW
Using the example of building a data center powered by electricity
Capital expenditures (CAPEX)
111 million rubles
1,5 million rubles
10 million rubles
3,5 million rubles
96million rubles
Operating expenses (OPEX)
3.97 million ₽
3.97 million rubles
Financial metrics
At a BTC exchange rate of 115,000 $, USD 83 ₽
51 %
annual yield
23 month
payback period
4,07 million rubles
monthly net profit

Project economics per 1 MW
Investment potential depending on the BTC exchange rate
| 1 BTC = $ 115,000 | 1 BTC = $ 150,000 | 1 BTC = $ 200,000 | |
|---|---|---|---|
| Yield, % per year | 51% | 82,73% | 118,14% |
| Payback period | 23 mo | 14 mo | 9 mo |
| Net profit | 4.07 million rubles | 6.62 million ₽ | 10.24 million RUB |
Scroll sideways
Project implementation stages
Site audit
Technology and logistics
- Studying technical specifications (TS) and options for connecting to utility networks
- Evaluating transport accessibility and the convenience of drop-off/service
Finance and Law
- Comparing electricity tariff plans (industrial, commercial, night-time) and their impact on OPEX
- Checking the legal regime of land and infrastructure, restrictions and encumbrances
- Analyzing current and planned contracts with energy companies
Infrastructure and security
- Checking availability, reservation and stability of communication channels, availability of providers
- Auditing physical security: CCTV, access control, security protocols
- Evaluating compliance with fire safety regulations
Comprehensive consulting
Financial model
- Cash Flow Forecast
- Scenario P&L — Profit and Loss Statement.
- Projected Balance Sheet.
- Investment evaluation: NPV/IRR/payback period.
- Unit economics: the economics of a unit of capacity/service.
Energy and infrastructure legal architecture
- Structure of contracts for connection, supply/transmission, and operation.
- Regulatory requirements and risk map.
Legal and financial scheme of mining
- An option for the independent mining of digital assets by a Russian legal entity.
- Option for exporting digital currencies and/or exporting computing power.
- Compliance with fire safety requirements
Comparative analysis of mining equipment
Lineup benchmark and TCO for key algorithms: SHA-256, Scrypt, kHeavyHash.
Technical specifications
Preparation of a detailed terms of reference for the design of the entire infrastructure.
Design and construction
Master plan and layout
- Layout plan for transformer substations (KTPN), containers, and technical modules.
- Routing of cable trays and site logistics.
Power supply
- Project for connection to power sources and load distribution.
- Organization of grounding and lightning protection loops.
Construction and installation works
Site preparation, earthwork and foundation works, structural erection.
Engineering and energy infrastructure
- Laying of 6/10 kV cable lines, installation of complete transformer substations.
- 0.4 kV network wiring, installation of modular data center units.
- Grounding and lightning protection systems.
Communications and Security
- Communication channel input, CCTV and Access Control System, Fire and Security Alarm System.
- Connection to external utility networks.
Equipping and launching a data center
Mining equipment
- ASIC miners (current models for the selected algorithms).
- Network and power switching equipment: routers, L2/L3 switches, PDUs.
- Monitoring and remote management platform with telemetry and alerts.
- Commissioning: configuration, load testing, putting into operation.
Data center operational management
24/7 Monitoring
- Automated collection of telemetry and alerts — continuous monitoring of node status.
- Most malfunctions are resolved remotely.
- A field engineer is assigned to each facility for complex repairs.
Service and infrastructure
- Dusting of rooms: in summer — 2 times a month, in winter — once every 4 months.
- Ventilation inspection and container filter replacement.
- Electrical testing on the low and high voltage sides.
- Purging, cleaning, visual inspection; if necessary — full maintenance with disassembly of components.
Document management
- Support for registration in the Mining Registry.
- Monthly reporting on mined cryptocurrency.
Construction of a data center
Building right now
By the beginning of 2027, the total capacity of the company's data centers will reach 500 MW.
220 MW
power
sites
sites
December 2026
scheduled date
launching
launching
120 MW
power
sites
sites
June 2026
scheduled date
launching
launching
86 MW
power
sites
sites
November 2025
scheduled date
launching
launching
10 MW
power
sites
sites
June 2025
scheduled date
launching
launching
Mining Cluster
An industrial mining operator providing a powerful and reliable infrastructure for the efficient scaling of your mining business.
4 pcs.
operating data centers
49 MW
general
power
power
120 000+ unit.
Sold
equipment
equipment
2+ billion. ₽
revenue
for 2024
for 2024
15 000+ unit.
ASICs
in management
in management
89 emloyees
state
companies
companies